Automatic Reacceleration for Uptime Maximization in iMMR

Automatic Reacceleration for Uptime Maximization in iMMR
Updated: | 6 min read

Technical Articles

The Challenge: Momentary power dips or voltage sags are common in industrial grids. These events often trip motors unnecessarily, leading to production stoppages and manual restart procedures, wasting time and impacting output. Traditional relays require manual intervention, creating costly downtime.


The iMMR Solution: The iMMR's configurable Automatic Reacceleration feature ensures maximum uptime. Upon detecting a healthy return of power after a transient event, it intelligently and safely restarts the motor according to pre-set parameters. This eliminates manual intervention, minimizes production interruptions, and maintains operational continuity, saving valuable time and increasing overall plant efficiency.

Automatic Reacceleration for Uptime Maximization in iMMR

About the Author

author

Sandeep Pawar,

General Manager - Product Management

Electrical Engineer with over 20 years of experience in Product Management and Application Engineering for Protection Relays, Power Quality Solutions, and Intelligent Motor Control Centres (MCCs). Possesses strong expertise in LV and MV power system protection schemes, motor protection, monitoring, and control applications. Well-versed in both conventional and intelligent motor management systems, with extensive knowledge of protection, control, and condition monitoring solutions.

Assistance Required?

Select an option to Contact Us

contact-sales
Contact Sales
product-sales
Contact Support